{"id":332,"date":"2019-07-21T16:55:01","date_gmt":"2019-07-21T14:55:01","guid":{"rendered":"http:\/\/p4dev.hardscrum.com\/?p=332"},"modified":"2024-05-17T12:57:04","modified_gmt":"2024-05-17T10:57:04","slug":"iteration","status":"publish","type":"post","link":"https:\/\/p4dev.hardscrum.com\/en\/iteration\/","title":{"rendered":"Iteration"},"content":{"rendered":"<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">The <strong>Iteration<\/strong> is a fixed length timebox for each of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rteamlevel\/\"><strong><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Teams<\/span><\/span><\/strong> <\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> within a <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rclusterlevel\/\"><strong><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster<\/span><\/span><\/strong> <\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> and corresponds to a constant basic rhythm. <\/span><span style=\"vertical-align: inherit;\">Usually, all Teams within the Cluster choose the same Iteration length, especially if they have interdependencies or supply relationships with each other.<\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Basically there is a choice between two, three or four week Iterations. <\/span><span style=\"vertical-align: inherit;\">Within a P4 Cycle, 3 four-week iterations, 4 three-week or 6 two-week iterations can take place.<\/span><\/span><\/p>\n<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Since the length of Iterations is always a multiple of weeks, the individual events and meetings always fall on the same day of the week.\u00a0<\/span><\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-624 size-full\" src=\"http:\/\/p4dev.hardscrum.com\/wp-content\/uploads\/sites\/3\/2019\/07\/Iteration.png\" alt=\"\" width=\"1426\" height=\"163\" srcset=\"https:\/\/p4dev.hardscrum.com\/wp-content\/uploads\/sites\/3\/2019\/07\/Iteration.png 1426w, https:\/\/p4dev.hardscrum.com\/wp-content\/uploads\/sites\/3\/2019\/07\/Iteration-300x34.png 300w, https:\/\/p4dev.hardscrum.com\/wp-content\/uploads\/sites\/3\/2019\/07\/Iteration-768x88.png 768w, https:\/\/p4dev.hardscrum.com\/wp-content\/uploads\/sites\/3\/2019\/07\/Iteration-1024x117.png 1024w\" sizes=\"(max-width: 1426px) 100vw, 1426px\" \/><\/p>\n<ul>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Each Iteration begins with a <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/planning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Planning<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , in which the following Iteration is planned by the Team.<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Every Nucleus Team performs a <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sync\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Sync<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> every day <\/span><span style=\"vertical-align: inherit;\">. <\/span><span style=\"vertical-align: inherit;\">The Team Syncs of different teams can take place simultaneously.<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Every week, often on the same day of the week as the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/planning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Planning<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , a <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/refinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Backlog Refinement is<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> carried out, in which the members of the Extended Team also participate (at least partially). <\/span><span style=\"vertical-align: inherit;\">Many teams use the time before or after the refinement as a weekly <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sync#extendedTeamSync\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Extended Team Sync<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , i.e. to coordinate the Nucleus and Extended Teams.<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">At the end of the iteration, a <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/review\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Review<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> is carried<\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> out to demonstrate the Team Results in front of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/stakeholder\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Stakeholders<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> .<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">The last event in the Iteration is the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/retrospective\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Retrospective<\/span><\/span><\/a>, <span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">in which the Team reflects and improves the &#8220;team process&#8221;, i.e. the way the Team works.<\/span><\/span><\/li>\n<\/ul>\n<h1><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster events during the iteration<\/span><\/span><\/h1>\n<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Events are also carried out at the Cluster level during the iteration. <\/span><span style=\"vertical-align: inherit;\">These are :<\/span><\/span><\/p>\n<ul>\n<li><a href=\"http:\/\/p4dev.hardscrum.com\/cluster-sync\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Sync (scrum-of-scrums)<\/span><\/span><\/a><\/li>\n<li><a href=\"http:\/\/p4dev.hardscrum.com\/clusterrefinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Backlog Refinements carried<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> out by the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/pogroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Product Owner Group (TPOG)<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> with the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sysenggroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team System Engineer Group (TSEG)<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> (estimate of items in the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/clusterbl\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Backlog<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> )<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">TSEG working hours: Reserved working hours for the TSEG. <\/span><span style=\"vertical-align: inherit;\">The Cluster cadence means that there is no overlap with the events of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rteamlevel\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Working Teams<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> and the working hours of the Cluster System Engineer Group (CSEG) at the organizational level.<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">TPOG working hours (including planning, sync, review, retrospective): Reserved working hours for the TPOG. <\/span><span style=\"vertical-align: inherit;\">By the Cluster Cadence there is no time overlaps with the events of <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/productowner\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Product Owner<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> and the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rteamlevel\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Working Teams<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , so <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/planning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Iteration<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/refinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Backlog Refinement<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/review\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Review<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/retrospective\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Retrospektive<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , and the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/clusterpogroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">CPOG<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> -Arbeitszeit.<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">&#8220;Practice time&#8221;: Working hours of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/cop\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Communities-of-Practive (CoP)<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , which are synchronized by the Cluster cadence or organizational cadence.<\/span><\/span><\/li>\n<\/ul>\n<h1><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Organization events during the iteration<\/span><\/span><\/h1>\n<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Events are also carried out at the organizational level during the iteration. <\/span><span style=\"vertical-align: inherit;\">These are :<\/span><\/span><\/p>\n<ul>\n<li><a href=\"http:\/\/p4dev.hardscrum.com\/organisation-sync\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Organization Sync (Scrum-of-Scrum-of-Scrums)<\/span><\/span><\/a><\/li>\n<li><a href=\"http:\/\/p4dev.hardscrum.com\/portfoliorefinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Portfolio Backlog Refinements carried<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> out by the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/clusterpogroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Product Owner Group (CPOG)<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> \u00a0with the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sysarchgroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster System Engineer Group (CSEG)<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> \u00a0(estimate of the items in the Portfolio Backlog)<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">CSEG working hours: Reserved working hours for the CSEG. <\/span><span style=\"vertical-align: inherit;\">The organizational cadence means that there is no overlap with the events of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rteamlevel\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Working Teams<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> and the working hours of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sysenggroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team System Engineer Group (TSEG) of<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rclusterlevel\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Clusters<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> .<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">CPOG working hours (including planning, sync, review, retrospective): Reserved working hours for the CPOG. <\/span><span style=\"vertical-align: inherit;\">Due to the organizational cadence there are no temporal ones<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Duplicating the events of <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/productowner\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Product Owner<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> and the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/rteamlevel\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Working Teams<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , so <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/planning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Iteration<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/refinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Backlog Refinement<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/review\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team-Review<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/retrospective\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Retrospektive<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , and the TPOG-working hours of the various Clusters.<\/span><\/span><\/li>\n<li><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">&#8220;Practice time&#8221;: Working hours of the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/cop\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Communities-of-Practive (CoP)<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> , which are synchronized by the Cluster cadence or organizational cadence.<\/span><\/span><\/li>\n<\/ul>\n<p><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">The following table shows the events in an iteration (1st column) and the events before and after a Cycle (2nd and 3rd column)<\/span><\/span><\/p>\n<table  class=\" table table-hover\" style=\"height: 411px;\" width=\"695\">\n<tbody>\n<tr style=\"background-color: #f8f8f8;\">\n<td><strong><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team level<\/span><\/span><\/strong><\/td>\n<td><strong><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster level<\/span><\/span><\/strong><\/td>\n<td><strong><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Organizational level<\/span><\/span><\/strong><\/td>\n<\/tr>\n<tr style=\"background-color: #f8ffff;\">\n<td><\/td>\n<td><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/portfolio-planning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Portfolio Planning<\/span><\/span><\/a><\/td>\n<\/tr>\n<tr style=\"background-color: #fff8ff;\">\n<td><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/cycleplanning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Planning<\/span><\/span><\/a><\/td>\n<td><\/td>\n<\/tr>\n<tr style=\"background-color: #fffff8;\">\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/planning\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Planning<\/span><\/span><\/a><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr style=\"background-color: #fffff8;\">\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/sync\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Sync, Extended Team Sync and joint Team Sync<\/span><\/span><\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/cluster-sync\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Sync<\/span><\/span><\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/organisation-sync\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Organization Sync<\/span><\/span><\/a><\/td>\n<\/tr>\n<tr style=\"background-color: #fffff8;\">\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/refinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Backlog Refinement<\/span><\/span><\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/clusterrefinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Backlog Refinement of<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sysenggroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">TSEG<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> with the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/clusterpo\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">CPO<\/span><\/span><\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/portfoliorefinement\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Portfolio Backlog refinement of<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/sysarchgroup\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">CSEG<\/span><\/span><\/a><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> with the <\/span><\/span><a href=\"http:\/\/p4dev.hardscrum.com\/portfolioowner\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">PFO<\/span><\/span><\/a><\/td>\n<\/tr>\n<tr style=\"background-color: #fffff8;\">\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/review\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Review<\/span><\/span><\/a><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr style=\"background-color: #fffff8;\">\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/retrospective\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Team Retrospective<\/span><\/span><\/a><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr style=\"background-color: #fff8ff;\">\n<td><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/cyclereview\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Review<\/span><\/span><\/a><\/td>\n<td><\/td>\n<\/tr>\n<tr style=\"background-color: #fff8ff;\">\n<td><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/cycleretro\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster Retrospective<\/span><\/span><\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/portfolio-review\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Portfolio Review<\/span><\/span><\/a><\/td>\n<\/tr>\n<tr style=\"background-color: #f8ffff;\">\n<td><\/td>\n<td><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/organisations-retrospektive\/\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Organizational Retrospective<\/span><\/span><\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"color: #000000;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">The <\/span><span style=\"vertical-align: inherit;\">fields highlighted in <\/span><\/span><span style=\"color: #ffcc00;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">yellow<\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> take place in each <\/span><\/span><span style=\"color: #ffcc00;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">iteration<\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> .<\/span><\/span><\/span><\/p>\n<p><span style=\"color: #000000;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">The <\/span><span style=\"vertical-align: inherit;\">fields highlighted in <\/span><\/span><span style=\"color: #ff99cc;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">pink<\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> take place in each <\/span><\/span><span style=\"color: #ff99cc;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Cluster cycle<\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> .<\/span><\/span><\/span><\/p>\n<p><span style=\"color: #000000;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">The <\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"color: #000000;\"><span style=\"vertical-align: inherit;\">fields <\/span><\/span><\/span><span style=\"color: #000000;\"><span style=\"color: #33cccc;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"><span style=\"color: #000000;\">highlighted in<\/span> cyan<\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> take place in every <\/span><\/span><span style=\"color: #33cccc;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">Portfolio cycle<\/span><\/span><\/span><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\"> .<\/span><\/span><\/span><\/p>\n<p><span style=\"color: #ffffff;\"><span style=\"vertical-align: inherit;\"><span style=\"vertical-align: inherit;\">.<\/span><\/span><\/span><\/p>\n<hr \/>\n<p>Further suitable links:<\/p>\n<table  class=\" table table-hover\" >\n<tbody>\n<tr>\n<td>Events<\/td>\n<td>Roles<\/td>\n<td>Groups<\/td>\n<td>Artifacts<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/planning\/\">Team Planning<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/sync\/\">Team Sync<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/refinement\/\">Team Backlog Refinement<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/review\/\">Team Review<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/retrospective\/\">Team Retrospective<\/a><\/p>\n<p><span style=\"color: #ffffff;\">.<\/span><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/cycle\/\">Cycle<\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/productowner\/\">Team Product Owner<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/systemengineer\/\">Team System Engineer<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/scrummaster\/\">Team Scrum Master<\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/rteamlevel\/\">Working Team<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/cop\/\">Community of Practice<\/a><\/td>\n<td><a href=\"http:\/\/p4dev.hardscrum.com\/teambl\/\">Team Backlog<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/ateamlevel\/\">Inspectable Results<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/dod\/\">Team DoD<\/a><\/p>\n<p><a href=\"http:\/\/p4dev.hardscrum.com\/improvementbacklog\/\">Team Improvement Backlog<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"The Iteration is a fixed length timebox for each of the Teams within a Cluster and corresponds to a constant basic rhythm. Usually, all Teams within the Cluster choose the same Iteration length, especially if they have interdependencies or supply relationships with each other. &nbsp; Basically there is a choice between two, three or four&hellip;","protected":false},"author":3,"featured_media":2021,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,21],"tags":[],"translation":{"provider":"WPGlobus","version":"2.10.10","language":"en","enabled_languages":["de","en"],"languages":{"de":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/posts\/332"}],"collection":[{"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/comments?post=332"}],"version-history":[{"count":53,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/posts\/332\/revisions"}],"predecessor-version":[{"id":334,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/posts\/332\/revisions\/334"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/media\/2021"}],"wp:attachment":[{"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/media?parent=332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/categories?post=332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/p4dev.hardscrum.com\/en\/wp-json\/wp\/v2\/tags?post=332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}