Mapping SAFe to P4

The Scaled Agile Framework and P4 have some commonalioties. On this page we want to contrast the terms of the two frameworks and translate them where possible.

SAFe Abr. P4 Abr. Description
Agile Release Train ART Cluster Group of teams (team-of-teams) that share a common responsibility, e.g. a product line. It is sometimes referred to as a “value stream” as well
Program Increment PI Cycle Big timebox (mostly 10 to 12 weeks), subdevided in Iterations/Sprints
Release Train Engineer RTE Cluster Scrum Master CSM The “Scrum Master” role on ART/Cluster level
Program Backlog Cluster Backlog The Program Backlog in SAFe is the backlog of multiple teams.
System Demo Cluster Review The System Demo in SAFe is the Review/Demo on the evelo of multiple teams (when those teams are working on the same system)
Product Management Cluster Product Owner CPO SAFe reuses the classical role of Product Management as kind of a “Chief Product Owner” on the ART/Cluster level.
System Architect/Engineer Cluster System Engineer CSE Highes technical role within the Cluster
Enterprise Architect Portfolio Architect PFA Highes technical role within the organization
Enterprise Management Portfolio Owner PFO Highes business role within the organization
Improvement Stories Improvement Backlog Items IBI Backlog items of orananizational improvements on the level of Team, Cluster or Orgamiozation
Lean Agile Center of Excellence LACE Cluster Scrum Master Group CSMG The Cluster Scrum Master Group forms the association of all (Cluster) Scrum Masters of the organization.