Portfolio Backlog Item (PFBI)

is aBacklog Item
consists ofAcceptance Criteria
is refined intoCluster Backlog Item
is constrainted byOrganization DOD
Multiple are parts ofPortfolio Backlog, Portfolio Cycle Backlog, Portfolio Kanban
is estimated byCluster System Engineer Group
is accepted byPortfolio Owner
is estimated inPortfolio Backlog Refinement, Portfolio Planning

Portfolio Backlog Items (PFBI) are the individual elements (Backlog Items) of a Portfolio Backlog and describe work for the entire Organization. The size of  a PFBI is initially not limited. It must be small enough in size or devided (refined in the Portfolio Backlog Refinement) into several individual items that can be done in one Portfolio Cycle, before it can be pulled into the Portfolio Cycle Backlog during the Portfolio Planning.

Portfolio Backlog Items are typically Application or Market versions of Products.