Team Iteration Backlog

is aBacklog, Team Artefact
consists of multipleTeam Backlog Item, Team Task
is owned byWorking Team
is adapted inTeam Sync
is inspected inTeam Retrospective
created inTeam Planning

The Team Iteration Backlog reflects the work of a Team for a currently running Iteration. The planned work, reflected by backlog elements, is pulled into the Team Iteration Backlog by the Working Team at the start of the Iteration, which is referred to as Pull.

 


Further suitable links: