The Team Iteration Backlog reflects the work of a Team for a currently running Iteration. The planned work, reflected by backlog elements, is pulled into the Team Iteration Backlog by the Working Team at the start of the Iteration, which is referred to as Pull.
Further suitable links:
Events | Roles | Groups | Artifacts |
Team Planning | Team Product Owner | Working Team | Inspectable Results
. . |